MRT Ampang Park

No items found.

Date Completed

Category

Client

Gamuda Engineering Sdn Bhd

MRT Ampang Park Building

The MRT Ampang Park is a significant infrastructure project part of the Kuala Lumpur MRT network aimed at enhancing urban mobility and connectivity. This building, located in the heart of Kuala Lumpur, serves as a critical transit hub, integrating various modes of transport and providing ease of access to commuters. Our company played a pivotal role in the construction of this landmark, contributing through specialized services in reinforced concrete, waterproofing, strutting, and earthworks.

Scope of Work

Reinforced Concrete
We provided comprehensive reinforced concrete services, which included the design, preparation, and execution of concrete elements essential for structural stability. This involved constructing foundations, columns, beams, and slabs.

 Key Tasks:
   - Formwork and shoring
   - Reinforcement detailing and placement
   - Concrete mixing, pouring, and curing

Waterproofing
Our waterproofing solutions were critical in ensuring the longevity and functionality of the building by preventing water ingress. This was particularly crucial for areas exposed to moisture and potential water damage.

 Key Tasks:
   - Application of membrane systems and coatings
   - Installation of drainage systems
   - Testing and inspection for leaks

Strutting
We implemented strutting solutions to support excavation and maintain stability during construction. This involved creating temporary structures to hold up the ground while work proceeded on the building’s foundations and substructures.

 Key Tasks:
   - Design and installation of strut systems
   - Monitoring and adjustment of strutting
   - Removal and dismantling post-construction

Earthworks
Our earthworks involved the excavation and movement of earth to prepare the site for construction. This included grading, trenching, and site leveling to ensure a solid foundation for the building.

 Key Tasks:
   - Site clearing and grading
   - Excavation for foundations and utilities
   - Soil compaction and stabilization

Challenges and Solutions

Reinforced Concrete Challenges


Challenge:

Ensuring structural integrity under high loads and varying environmental conditions.


Solution:

Implementation of high-strength concrete mixes and rigorous quality control during curing. Regular structural assessments and adjustments based on load-bearing calculations ensured safety and durability.

Waterproofing Challenges  

Challenge:

Preventing water ingress in a highly urban environment with high groundwater levels.

Solution:

Utilization of advanced waterproofing materials and techniques, including high-performance membranes and drainage systems. Detailed inspections and testing helped in identifying and addressing potential issues early.

Strutting Challenges


Challenge:

Maintaining stability in diverse soil conditions and varying excavation depths.

Solution:

Employing custom-designed strutting systems tailored to the specific soil characteristics and excavation requirements. Continuous monitoring and adjustment of strut placements ensured stability throughout the construction phase.

Earthworks Challenges


Challenge:

Managing excavation in an urban setting with restricted space and existing underground utilities.


Solution:

Detailed planning and coordination with other contractors to avoid conflicts with existing infrastructure. Use of modern excavation machinery and techniques allowed for efficient and precise earthworks.

These elements combined to ensure that the MRT Ampang Park building not only met but exceeded the high standards of modern urban infrastructure.