MRT Line 2 Underground Escape Shaft

No items found.

Date Completed

Category

Client

IDE Totalap Joint Venture

Project Overview

The MRT Jalan Gurney Escape Shaft 2 is part of the larger MRT Putrajaya Line (SSP Line) project in Kuala Lumpur, Malaysia. The escape shaft is a critical safety feature, designed to provide an emergency exit and ventilation for the underground sections of the MRT line. Located in a densely populated urban area, the construction of the escape shaft posed several engineering challenges, necessitating innovative construction techniques and stringent safety measures.

Scope of Work by Cergas Setia

1. Reinforced Concrete Shaft Construction:

  • Construction of a deep vertical shaft using reinforced concrete to ensure structural integrity and durability.
  • Implementation of advanced construction techniques to manage the depth and diameter requirements of the shaft.

2. Waterproofing Works:

  • Comprehensive waterproofing to prevent water ingress and protect the structural integrity of the shaft.
  • Use of specialized materials and techniques to ensure long-term water resistance.

Theoretical Challenges and Solutions

1. Reinforced Concrete Shaft Construction:

  • Challenges:
    • Managing the depth and stability of the excavation in a densely populated urban area.
    • Ensuring the structural integrity of the shaft during and after construction.
  • Solutions:
    • Utilizing advanced excavation techniques such as diaphragm walls and slurry walls to maintain soil stability and prevent collapse.
    • Employing high-strength concrete mixes and reinforcement bars to achieve the required structural strength.
    • Continuous monitoring of soil conditions and structural integrity throughout the construction process.

2. Waterproofing Works:

  • Challenges:
    • Ensuring complete waterproofing in an underground environment with high hydrostatic pressure.
    • Preventing long-term water ingress that could compromise the structural integrity of the shaft.
  • Solutions:
    • Implementing a multi-layered waterproofing system, including membranes and sealants specifically designed for high-moisture conditions.
    • Regular inspections and maintenance to detect and address any potential leaks or weaknesses in the waterproofing system.
    • Use of high-quality waterproofing materials and advanced application techniques to ensure a robust and durable solution.

By overcoming these challenges with innovative solutions and a commitment to quality, Cergas Setia successfully contributed to the construction of the MRT Jalan Gurney Escape Shaft 2. This project showcases our expertise in handling complex underground construction tasks and our ability to deliver high-quality results in challenging environments.