KLCC East MRT Station

No items found.

Date Completed

Category

Client

Gamuda Engineering

Project Overview
The KLCC East building, part of the MRT Line 2 (SSP) Underground Works, is a significant addition to Kuala Lumpur's public transit infrastructure. This modern facility is designed to enhance connectivity and reduce traffic congestion in the city.

Scope of Work
Reinforced Concrete: Construction of foundational and structural elements.
Waterproofing: Ensuring all underground structures are protected from water ingress.
Strutting: Providing temporary support during excavation and construction.

Theoretical Challenges and Solutions


Challenges:

Structural Integrity: Ensuring the reinforced concrete can withstand substantial loads and stresses.
Water Management: Effective waterproofing to prevent water ingress into underground structures.
Excavation Stability: Maintaining the stability of excavations with effective strutting methods.


Solutions:
Advanced Engineering: Using high-strength concrete and precise structural calculations for durability.
Innovative Waterproofing: Implementing advanced waterproofing materials and techniques to ensure long-term protection.
Efficient Strutting Systems: Designing robust and adaptable strutting systems to provide necessary support and safety during construction.